Build Your Park Day with the Park-Day Builder
The Park-Day Builder turns a list of must-dos into an ordered plan for a single park day. You tell it the park, the date and what matters most; it sequences those rides into a realistic order using wait forecasts and best-time-to-ride patterns, so you’re hitting each attraction near its quieter stretch instead of walking the park twice.
It lives on the Plan tab (/app/plans) and is included with Silver and Gold.
How to build a day
- Open the Plan tab and start a new park day.
- Pick the park and the date. The builder pulls that day’s crowd forecast so a busy Saturday plan looks different from a quiet Tuesday one.
- Add your must-dos from the ride catalog.
- Set your ride priority list — 5 Must ride down to 0 Skip. Leaving a ride unranked isn’t the same as ranking it 0; it just means “no strong opinion.”
- Add any dining you already have booked, plus your rough arrival and departure times.
- Generate the plan, then reorder anything by hand — it’s your day, not a locked script.
How it decides the order
- Best time to ride. Each attraction has its own quiet windows. The builder slots your high-priority rides into theirs rather than spreading them evenly.
- Rope drop first. The rides that balloon worst by mid-morning go earliest, because that’s the hour you can’t get back.
- Lightning Lane fit. Where you’re using Lightning Lane Multi Pass or Single Pass, the plan works around those return windows instead of fighting them.
- Walking sense. It groups rides by area so you’re not crossing the park between every step.
- Your fixed points. Meals and show times anchor the plan; rides fill the gaps around them.
Keeping the plan honest during the day
A plan made last night won’t match a park that’s running two rides down. Pair it with:
- Ride-Now (/now) for what to do next based on the live board.
- Drop Watch (/app/drop) so you hear the moment a Lightning Lane refills or a hard-to-get table frees up.
- Merlin, which can read your priority ranking and talk through a reshuffle.
A note on booking
SupaPark plans and alerts — it never books. When the builder says to grab a Lightning Lane, or Drop Watch pings you about a table, you confirm it yourself in My Disney Experience. Advance Dining Reservations open 60 days before arrival at 6:00 AM Eastern; Lightning Lane Multi Pass selections open at 7:00 AM Eastern on your eligible day.
If you’re on Free
Everything the builder reasons from is free forever — live waits, the crowd calendar, wait forecasts and best-time-to-ride. You can plan by hand with those today; Silver adds the builder itself, unlimited push alerts and the 7 AM Board.
Stuck or seeing something odd in a plan? Email support@help.supapark.com with your account email and what happened — a real person reads it.
Planning a specific day? Ask Merlin, SupaPark's AI planner — it reads live waits, Lightning Lane sellouts and dining drops for you.