Tropical Americas Photos Show Temple and Playground Work

Published November 29, 2026

Aerial photographs taken on Saturday, November 28, 2026, show vertical construction progress across the 11-acre Tropical Americas expansion at Disney’s Animal Kingdom, according to a report on Sunday, November 29, 2026. The images show exterior facade work on the Maya pyramid for Indiana Jones and the Myth of the Jade Serpent and foundation work for a new family playground inside the former DinoLand U.S.A. footprint as of Sunday, November 29, 2026. Disney has not confirmed the specific construction details or completion schedules seen in the images.

At the former DINOSAUR attraction site, multi-tier scaffolding and construction platforms surround the stepped pyramid facade for Indiana Jones and the Myth of the Jade Serpent. The upper levels of the temple display painted Mesoamerican reliefs in teal, rose, and gold, including serpent designs and a carved mask face above the main entrance. Dense rockwork mesh covers the stepped lower half of the exterior, while the existing show building roof and the domed rotunda from the former Dino Institute entrance remain visible behind the new facade.

In front of the temple, crews have cleared an open entry plaza inside the Bonanche Bioreserve excavation area, where Walt Disney Imagineering previously detailed plans for carved stone stelae along the approach. Set in a tropical preserve, the Animal Kingdom attraction follows an original storyline distinct from the Disneyland version, centering on a Maya temple and a mythical creature.

Nearby, between the Indiana Jones pyramid and the village structures of Pueblo Esperanza, a new family playground is in the foundation and infrastructure phase. Surrounding village buildings have progressed to framing and roofing as work continues toward the land’s scheduled 2027 opening.

What we know

  • Tropical Americas (Disney’s Animal Kingdom) — 11-acre transformation of DinoLand U.S.A. remains under active construction as of Sunday, November 29, 2026, ahead of a scheduled 2027 opening.
  • Indiana Jones and the Myth of the Jade Serpent (Disney’s Animal Kingdom) — replacing the former DINOSAUR ride; upper pyramid facade shows teal, rose, and gold painted carvings while the lower stepped base is wrapped in rockwork mesh.
  • Bonanche Bioreserve Plaza (Disney’s Animal Kingdom) — open entry plaza cleared in front of the temple facade.
  • Tropical Americas Playground and Pueblo Esperanza (Disney’s Animal Kingdom) — play space is at the foundation and infrastructure stage, while adjacent village buildings have reached framing and roofing.

What’s not confirmed

Disney has not announced an exact 2027 opening date for Tropical Americas, Indiana Jones and the Myth of the Jade Serpent, or the Bonanche Bioreserve playground, and has not confirmed the specific rockwork finishing techniques or construction timeline for the lower temple facade.

Planning around this? See crowds for my dates.

What it means for your trip

  • Visiting before the 2027 opening: With the former DinoLand U.S.A. footprint and DINOSAUR closed for construction, Animal Kingdom operates with one fewer indoor thrill ride, pushing more demand toward remaining headliners.
  • Rope drop and Lightning Lane strategy: Let Avatar Flight of Passage in Pandora absorb the primary morning crowd surge, then head to Expedition Everest in Asia during the first hour of park operation or near park close when standby lines typically soften. If riding Expedition Everest is a priority for your group, book it as one of your advance Lightning Lane Multi Pass selections (7 days before arrival for Disney resort guests, 3 days before for off-site guests, starting at 7:00 AM Eastern).
  • Catch wait-time drops automatically: Set a live wait-time watch in SupaPark to get an alert when Expedition Everest’s line drops so you can time your walk to Asia without refreshing the board all afternoon.

Frequently Asked Questions

When does Tropical Americas open at Disney’s Animal Kingdom?

Tropical Americas is scheduled to open in 2027 at Disney’s Animal Kingdom, though Disney has not announced a specific month or day.

What ride is Indiana Jones and the Myth of the Jade Serpent replacing?

Indiana Jones and the Myth of the Jade Serpent is replacing the former DINOSAUR attraction inside the 11-acre footprint that previously housed DinoLand U.S.A.


Go deeper — the full guides: Slinky Dog Dash: Scary? Worth It? Lightning Lane Refill Tips · Mad Tea Party and Motion Sickness: How to Ride the Teacups · Test Track Hits 65 MPH — Here’s How to Actually Ride It

SupaPark tracks live wait times and crowd forecasts, and pings you the second a hard-to-get reservation opens or a ride goes walk-on — free to start at supapark.com.

Going to Disney? Pick your dates

Free with a SupaPark account: the crowd forecast for each of your days, and alerts for the rides and tables you pick. See plans and pricing or get the app.

Tools for your trip

Go deeper: the full guides

Add SupaPark as a preferred source on Google