Cars Ridge Run Rally Gets Its First Concrete Walls

Published November 22, 2026

As of Sunday, November 22, 2026, Disney construction crews had raised the first above-ground concrete walls at the Cars Ridge Run Rally site in Magic Kingdom’s Piston Peak National Park, according to a report based on aerial photos published that day. The walls form a box-shaped structure beside The Diamond Horseshoe retaining wall, where crews poured a flat slab in October. Disney has not confirmed the construction milestone.

The structure is the clearest sign of above-ground work after months of retaining walls, buried utilities and foundations in the former Rivers of America basin. Steel reinforcing bars extend above the tops of the new walls.

Beside the concrete structure, angled grids of steel reinforcement rest on heavy timber supports and step down toward the creek channel. Imagineers previously described Cars Ridge Run Rally as a family thrill ride that climbs to a snowy summit and splashes through a creek. The images show where the decks sit in relation to the channel.

The wider aerial view shows a construction road linking Piston Peak National Park to the area being graded for Villains Land west of the Haunted Mansion. Crews have also widened the excavation near Big Thunder Mountain Railroad since October, leaving a stepped pit beside two round utility vaults.

What we know

  • The Diamond Horseshoe retaining wall — the first above-ground concrete structure stands beside it.
  • Piston Peak creek channel — timber-supported reinforcement decks step down toward it.
  • Former Liberty Square riverboat landing — retaining walls now surround the building on three sides.
  • Villains Land — a construction road connects its grading area to the Piston Peak site.

What’s not confirmed

Disney has not confirmed what the concrete structure will house or whether the angled decks and the excavation near Big Thunder Mountain Railroad are part of the ride route. Disney has not announced an opening date for Cars Ridge Run Rally.

Planning around this? See crowds for my dates.

What it means for your trip

Keep Cars Ridge Run Rally off your Magic Kingdom itinerary until Disney gives it an opening date. If you’re filling that slot with another family thrill ride in Frontierland, check Big Thunder Mountain Railroad’s height requirement before making it a priority for your group.


Go deeper — the full guides: Slinky Dog Dash: Scary? Worth It? Lightning Lane Refill Tips · Mad Tea Party and Motion Sickness: How to Ride the Teacups · Test Track Hits 65 MPH — Here’s How to Actually Ride It

SupaPark tracks live wait times and crowd forecasts, and pings you the second a hard-to-get reservation opens or a ride goes walk-on — free to start at supapark.com.

Going to Disney? Pick your dates

Free with a SupaPark account: the crowd forecast for each of your days, and alerts for the rides and tables you pick. See plans and pricing or get the app.

Tools for your trip

Go deeper: the full guides

Add SupaPark as a preferred source on Google